Wildwood Water Fixture Repairs Update

Repairs have been completed on 43 of the water fixtures in the classroom and ELL areas at Wildwood that tested above the action level of 15 ppb for lead.  I am pleased to report that 38 of the fixtures now test below the action level on first draw, and all tested below the action level on the flush draw.  Full results can be found here.

Additional repairs and retesting will be made on the five fixtures that still tested above the action level on first draw, as well as in a few places outside the classroom and ELL areas of the school.  In the meantime, staff will continue to follow the flushing protocol for those five quad fixtures and in areas that still need retesting.  All other water outlets in Wildwood School are now operational with no flushing protocols required.